Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Design, supply and installation of PS "Chomi" 115KV substation

 

Client: Tajikistan Power Transmission Company

image4.jpg

【Project Overview 】

 

Following the success of the Siroch Bahrom project, we were once again entrusted by the client to construct the 115KV power station of PS "Chomi". This project fully drew on the experience of the previous project, further optimized the design and equipment selection, adopted a more compact layout and a higher domestic equipment utilization rate, while ensuring performance and saving investment costs for the client.

 

During the project execution, we implemented a strict project schedule and quality management system to ensure high-quality completion within the contract period. The completion of this power station has formed a ring network power supply with the existing power grid, significantly enhancing the strength and risk-resistance capacity of the power grid structure in the capital of Tajikistan and its surrounding areas.

Customer Testimonials

After replacing the energy-saving transformer, the factory's average monthly electricity consumption has dropped by about 15%. The no-load loss and load loss are significantly lower than the national standard. The electricity bill saved by long-term use is close to the equipment purchase cost, and the cost-effectiveness is outstanding.

Jack Richardson

Jack Richardson

Time: 2022.06.24

The quality of the transformers is excellent, and the technical support team is very professional. They helped us customize the solution according to our specific requirements and provided excellent after-sales service.

Sarah Wilson

Sarah Wilson

Time: 2022.07.15

Outstanding product reliability and performance. We have been using their transformers for over 3 years without any issues. The energy efficiency has significantly reduced our operational costs.

Michael Chen

Michael Chen

Time: 2022.08.20